At the Guzhumsay mine, a vertical shaft was constructed with a modern dewatering complex.
The project was delivered on a turnkey basis and included all stages — from design to commissioning.
Проект реализован «под ключ» и включает все этапы — от проектирования до пусконаладочных работ.
As a result, the project ensures stable mine operation, increased production capacity, and improved safety conditions.