Samarchuk — vertical shaft for AGMK

photo_2025-08-12_17-24-34
Client:
JSC “Almalyk MMC”
Category:
Mine construction
Timeline:
TBA

Samarchuk — vertical shaft for AMMC

At the Samarchuk mine, a vertical shaft construction project was implemented with a turnkey dewatering system.
The project included shaft sinking, installation of the dewatering system, and the setup of specialized equipment.


The completed works increased extraction efficiency and ensured reliable mine operation.